SAP PP Interview Questions

Back flush - The item which is in back flush will issue components Automatically. It means, you don't need manually issue components.Use this method when there is no batch controlled item exist.

Manual Issue - The item which is in manual, you should issue components manually. It means, you need to manually issue components.Use this method when there is batch controlled item exist.

Saturday, 15 March 2014

PP Interview Questions & Answers

Split planned order during MRP run by production version?

We have 2 production lines within one plant to produce the same  finished  product.  For  planning, we  put  the  planning quantity for finish product in Demand Management with a daily planning period and differentiated the production line with a production version. The problem occurs when we run MRP. The system automatically accumulates the requirement in a same day demand. Hence, we need to automatically split the planned order with a different production line. Since the lot size range is the same, is there a more efficient way as to how we can split the planned order?

If you want to split the planned order by percentage, you can use quota arrangement (meq1). If you want to split order by capacity, then you might want to use fixed lot size, and finite capacity with option “ changing
production version on error”.

Monday, 26 August 2013

SAP PP Interview Questions and Answers

What is the difference between By-product and Co-product and how do you differentiate them in a BOM? 
  1. Co-product costs are settled with a apportionment structure (shared with all products). In By-product the price is credited to the order or the material stock account of the lead material being manufactured. 
  2. Co-Product as well as by-product are defined as BOM Components/Items. Both of them have negative quantities. ( Not all negative quantity items fall under these categories!).When BOM is created for FERT , you can see one indicator in COMPONENT DETAILS screen for co-product.You need to define the co-products with this special indicator .
  3. Co-product must have costing value. Must have a settlement rule and mandatory with main product. By-product has no costing and settlement rule.bulk product MRP run can not consider the bulk product.

Friday, 23 August 2013

SAP Factory Calendar ?

  1. Factory calendar contain company specific dates such as alternate working Saturdays, Plant shutdown etc. 
  2. You can create your company factory calendar via transaction code 'SCAL'
  3. Assignment of the factory calendar by plant is done in transaction code 'SM30 - V_T001W'
  4. An example of a SAP application that uses the factory calendar is the SAP MRP modules
  5. Assuming that you have a specified an alternate working Saturday, MRP will postponed the planned orders to the next working day if it happened to falls on a non-working Saturday.